Home » Guest » Pt. Tovan Prima Hanurata

Pt. Tovan Prima Hanurata

Business category 1 Fertilizer
City ( of main office ) Jakarta, ID, Indonesia
Address Jl. Let. Jen Suprapto 160 Blok A-8
Phones 62-21-4210404
Fax 62-21-4210406
About We PT. TOVAN PRIMA HANURATA, trading in collaboration with the miners, confirmed with full corporate offer responsibility, that we are ready and capable into sell the commodity, with the following terms, conditions and specification as stated below. The sales and purchase contract would be in accordance with International standars and procedure :

Total Moisture ARB 08 _ 10 Maximum
Inherent Moisture 05 _ 07 Approx
Ash Content 17 _ 20 Maximum
Calorific Value 65 _ 63 Kcal / Kg
Hard grove Index 38 Minimum
Fixed Carbon By Dif Approx
Volatile Matter 40 _ 45 Approx
Sulfur Content 1.5 _ 2.0 Maximum
Size 0_50 mm 85 %
e 50 mm 15 %

Total Moisture ARB 16 _ 18 Maximum
Inherent Moisture 08 _10 Approx
Ash Content 14 _ 18 Maximum
Calorific Value 63_ 61 Kcal / Kg
Hard grove Index 40 miinimum
Fixed Carbon By Dif Approx
Volatile Matter 38 _ 43 Approx
Sulfur Content 0.8 _ 1.4 Maximum
Size 0_50mm 85 %
e 50mm 15 %

Total Moisture ARB 16_ 18 Maximum
Inherent Moisture 08 _ 10 Approx
Ash Content 14 _ 18 Maximum
Calorific Value 63 _ 61 Kcal / Kg
Hard grove Index 40 Minimum
Fixed Carbon By Dif Approx
Volatile Matter 38 _ 43 Approx
Sulfur Content 0.8 _ 1.4 Maximum
Size 0_50 mm 85 %
e 50 mm 15 %

Total Moisture ARB 27_ 33 Maximum
Inherent Moisture 13 _ 16 Approx
Ash Content 09 _ 14 Maximum
Calorific Value 58 _ 56 Kcal / Kg
Hard grove Index 42 Minimum
Fixed Carbon By Dif Approx
Volatile Matter 39 _ 43 Approx
Sulfur Content 0.7 _ 1 Maximum
Size 0_50 mm 85 %
e 50 mm 15 %

Total Moisture ARB 30_ 35 Maximum
Inherent Moisture 15 _ 19 Approx
Ash Content 04 _ 08 Maximum
Calorific Value 55_ 53 Kcal / Kg
Hard grove Index 48 Minimum
Fixed Carbon By Dif Approx
Volatile Matter 38 _ 48 Approx
Sulfur Content 0.5 _ 0.9 Maximum
Size 0_50 mm 85 %
e 50 mm 15 %

Capacity : 20.000 _ 40.000 Metric per Month
Barge : Maximal 270 Feet ( 5.500 MT)
Loading Schedule : Barge 14 day after Sign Contract
Loading Schedule : Vessel 45 day after LC Confirm Bank to Seller

Payment I : 50% Steam Coal confirm from to buyer and contract
40% Steam Coal in Barge Minimal 20 %
10% Full Document

Payment II : Issuing SKBDN from Any Bank in Indonesia
Issuing Irrevocable Letter Of Credit at Sight
Non transferable from Prime Bank

Quantity : 10.000 MT_ 40.000 MT / shipment
Date 2011 Oct 28, 22:10